Article Details

Communications cable tunnel to be drilled for 800 metres under Floreat Beach

Retrieved on: 2018-03-30 23:22:30

Tags for this article:

Click the tags to see associated articles and topics

Communications cable tunnel to be drilled for 800 metres under Floreat Beach. View article details on HISWAI:

Excerpt

<div><b>Telstra</b> will start drilling an 800m-long tunnel under Floreat Beach to house a critical component of a communications cable between Perth and Singapore. A consortium led by the telco including AARNet, Google, Indosat Ooredoo, Singtel Optus and SubPartners, is bankrolling the subsea cable, which is ...</div>

Article found on:

View Original Article

This article is found inside other Hiswai user's workspaces. To start your own collection, sign up for free.

Sign Up