Article Details

FERC Blocks Amazon From Drawing Power from Berwick Electrical Plant

Retrieved on: 2025-01-26 12:36:15

Tags for this article:

Click the tags to see associated articles and topics

FERC Blocks Amazon From Drawing Power from Berwick Electrical Plant. View article details on hiswai:

Excerpt

BERWICK — The Federal Energy Regulatory Commission has rejected a deal that would have allowed Amazon Web Services (AWS) to draw power directly ...

Article found on: www.wkok.com

View Original Article

This article is found inside other hiswai user's workspaces. To start your own collection, sign up for free.

Sign Up