Article Details

Financial close for gasification and power JV - Hydrocarbon Engineering

Retrieved on: 2023-01-23 16:35:46

Tags for this article:

Click the tags to see associated articles and topics

Financial close for gasification and power JV - Hydrocarbon Engineering. View article details on HISWAI: https://www.hydrocarbonengineering.com/refining/23012023/financial-close-for-gasification-and-power-jv/

Excerpt

The JV serves Aramco's Jazan Refinery, a megaproject to process 400 000 bpd of the crude oil to produce main products such as ultra-light sulfur ...

Article found on: www.hydrocarbonengineering.com

View Original Article

This article is found inside other Hiswai user's workspaces. To start your own collection, sign up for free.

Sign Up